Hard Rock Las Vegas Advances Plans for Three Entertainment Venues in Former Mirage Redevelopment

Noah Sullivan · Aug 17, 2026

Hard Rock Las Vegas Advances Plans for Three Entertainment Venues in Former Mirage Redevelopment

Architectural rendering of Hard Rock Las Vegas Guitar Hotel tower and surrounding entertainment district

Hard Rock International is developing three distinct entertainment venues as part of its redevelopment of the former Mirage property on the Las Vegas Strip into the Hard Rock Las Vegas resort, anchored by the Guitar Hotel tower and scheduled to open in late 2027, with details drawn from Clark County filings and project documents that now head to the Paradise Town Advisory Board for review before final Clark County Commission approval.

The west side of the property will feature a new 2,000-seat West Theater arena built as fresh construction, while the existing Beatles Love theater space converts into the 5,000-seat Hard Rock Live for major acts and residencies, and the former Mirage Theater undergoes repurposing for intimate shows such as comedy performances or specialty productions.

Project Background and Timeline

Clark County records show the entertainment lineup forms part of the broader transformation that replaces the Mirage with Hard Rock branding and facilities, where construction activity continues through 2027 and the Paradise Town Advisory Board review stands as the next formal step in the approval sequence as of August 2026.

Documents submitted to county planners outline how each venue fits the overall resort footprint, with the Guitar Hotel tower serving as the central landmark and the three performance spaces distributed across the site to handle different audience sizes and event types.

Details of the Three Venues

The 2,000-seat West Theater arena represents new construction on the west side of the property, designed to accommodate concerts and other large-scale events while integrating with the surrounding resort layout that includes retail and dining areas already in planning stages.

Replacement of the former Beatles Love theater creates the 5,000-seat Hard Rock Live, a mid-sized hall positioned for headline residencies and touring productions, and the conversion maintains structural elements from the original space while updating technical infrastructure to meet current production standards.

The repurposed former Mirage Theater shifts focus toward smaller audiences, supporting comedy shows and specialty productions that require flexible seating and stage configurations different from the larger arenas elsewhere on the property.

Interior view of planned Hard Rock Live theater space during redevelopment

Approval Process and County Filings

Project documents filed with Clark County detail the venue specifications, site plans, and operational outlines, after which the Paradise Town Advisory Board conducts its review before the matter advances to the full Clark County Commission for final approval.

Those filings reference capacity figures, construction timelines, and integration points with the Guitar Hotel tower, while county staff prepare reports that summarize compliance with zoning and building requirements ahead of the advisory board meeting.

Observers familiar with similar Strip redevelopments note that the sequence from filing through advisory board and commission review typically spans several months, allowing public comment periods and adjustments based on feedback received during the process.

Integration with Resort Operations

Each venue connects to the larger Hard Rock Las Vegas layout through pedestrian pathways, shared loading areas, and coordinated event scheduling that prevents overlap during peak periods, according to the project applications submitted to county authorities.

The distribution of 2,000-seat, 5,000-seat, and intimate theater capacities allows the resort to host simultaneous events across different scales, a configuration reflected in the site plans that allocate parking, security, and hospitality support accordingly.

Conclusion

Clark County filings establish the framework for the three entertainment venues within the Hard Rock Las Vegas redevelopment, where the West Theater arena, Hard Rock Live, and repurposed Mirage Theater move through the Paradise Town Advisory Board and commission review process toward a late 2027 opening alongside the Guitar Hotel tower.